- Maximus Resources (MXR) has completed reverse circulation (RC) drilling at its S5 gold prospect, Wattle Dam Gold Mine, and Redback gold deposit in WA
- The company began drilling at the S5 prospect in early November to follow-up on previous work, which intersected up to 83.3g/t gold
- Maximus has also completed drilling at the Wattle Dam Gold Mine and Redback gold deposit which tested a potential linking structure between them
- As a result, a decision made to complete the remaining holes using a diamond drill rig with work scheduled to begin in early December
- The diamond tails are a preferred option as they gain significantly more geological information and are cost-effective
- Maximus has ended the day 11.1 per cent in the green with shares trading at 15 cents