- Hydrocarbon Dynamics (HCD) has received a repeat order from a distributor for the Multi-Flow product, for around $80,000
- Testing the ability of HCD Multi-Flow to reduce or prevent the buildup of paraffin deposition in wells and flowlines
- Multi-Flow isa chemical injected into pipelines and wells to control waxes, asphaltenes and resins which can accumulate and decrease flow rates
- The distributor has also reported an increase in production of around 13 per cent across 15 wells at the trial project in Alberta
- Then the new order of HCD Multi-Flow will used in the ongoing trial in Alberta
- Shares have been up 25 per cent at 3 cents at 3:40 pm AEDT