Chase Mining: Completes diamond drilling at Lorraine Mine
- Chase Mining has completed a six-hole diamond drilling program at its Lorraine Mine Gold Project in Quebec
- Then the company increased the initial four-hole, for 1570 metres, drilling program to six holes for a total of 2928 metres
- The first four holes drilled all intersected the Footwall Contact Target Zone (FCTZ)
- One hole intersected a 150 metre-wide shear zone, which contains intense silica-carbonate alteration, along with quartz veining and sulphides
- Samples from all drill holes will submitted for analyses once core logging and samples have completed
- Company shares are down 6.9 per cent and are trading for 2.7 cents