Aurumin Delivers MRE increases at Sandstone operations, WA
- Aurumin (AUN) increases the combined mineral resource estimate (MRE) for the Shillington and Two Mile Hill deposits within its Central Sandstone project in WA
- Following recent drilling, the open pit deposits now have an MRE of just over four million tonnes at 1.4 g/t gold for 180,500 ounces
- This takes the Central Sandstone’s total MRE to 18.5 million tonnes at 1.5 g/t gold for roughly 881,000 ounces of gold at a 0.73 g/t cut-off
- When including the Johnson Range open pit deposit, the broader Sandstone operations’ MRE stands at 19.3 million tonnes at 1.5 g/t gold for 946,000 ounces, at a 1.0 g/t cut-off
- AUN shares are up 3.7 per cent to trade at 8.4 cents at 3:28 pm AEDT